timber summer house Fundamentals Explained
I dug a hole 400mm deep and positioned each write-up into it. The publish was secured in position using a bag of premixed concrete bad that just needed drinking water adding to it and no mixing and sets within thirty minutes. I took care to be sure each post was buried the same depth, vertically degree and square with one another. The ground, wall